Cordula BARZANTNY

Guoqing WANG

Tel :85220871
Email :tgqwang@jnu.edu.cn

Production and Operations Management & Logistics Management

Overview

Education
Ph.D.in Management Science and Engineering from The Hong Kong Polytechnic University, China

Publications
1. Wang, G., and Cheng, T.C.E., 2007. Customer order scheduling to minimize the total weighted completion time, Omega, 35, 623-626.
2. Cheng, M.B., Wang, G., 2009. A note on the inventory model for deteriorating items with trapezoidal type demand rate, Computers & Industrial Engineering, 56, 1296-1300.
3. Cheng, M.B., and Wang, G., 2009. Parallel machine scheduling problems with proportionally deteriorating jobs, International Journal of Systems Science, 40 (1), January 2009, 53-57.
4. Cheng, M., Zhang, B., and Wang, G., 2011. Optimal policy for deteriorating items with trapezoidal type demand and partial backlogging, Applied Mathematical Modelling, 35, 3552-3560.
5. Yang, Z., Wang, G., and Chu, F., 2013. An effective GRASP and tabu search for the 0-1 quadratic knapsack problem, Computers & Operations Research, 40, 1176-1185.
6. A Decision Model Based on VE Theory for Operation Strategy Optimization, published in Reformation & Strategy on Aug. 1, 2009. 
7. Heuristic Algorithm of Restocking Operation Problem in Distribution Centre, published in EI on April, 1, 2008.
8. Batching Orders Optimization with Due Date Time Constraints in Warehouse By Minimizing Travel Time and Lateness, published in Wuhan University Journal ( Humanity Sciences) on June, 1, 2009.
9. Inventory Competitive Products' Revenue-sharing Contract under VMI, published in Systems Engineering-theory & Practice on June, 1, 2009.
10. Heuristics for Order Picking Optimization Problem of Multiple Carousels System in Distribution Center, published in Journal of Systems & Management on April, 1, 2008.
11. Optimization Algorithms for Order Picking in Distribution Centers, published in Industrial Engineering Journal on Sept. 1, 2008.
12. An Improved Nearest Items Heuristics for the Order Picking Optimization of Multiple Carousels System in Distribution Center published in Industrial Engineering and Management on April, 1, 2008.
13. Yang, Z., Wang, G., Chu, F., 2013. An effective GRASP and tabu search for the 0-1 quadratic knapsack problem, Computers & Operations Research, 40, 1176-1185.
14. Zhong, X., Ou, J., and Wang G., 2014. Order acceptance and scheduling with machine availability constraints, European Journal of Operational Research, 232, 435-441.
15. Ou, J., Zhong, X., Wang, G., 2015. An improved heuristic for parallel machine scheduling with rejection, European Journal of Operational Research, 241, 653-661.


Consulting Projects

1. Operation process and management optimization of automobile spare parts warehouse, Guangzhou Commercial Storage and Transport Company, 2010.7 – 2011.7, contract fund RMB150,000.
2. Factory operation management diagnosis and improvement research of Huayi Lighting Company Limited, 2011.8 – 2012.7, contract fund RMB280,000.
3. Establishment of urban distribution system of third party logistics enterprise and analysis of profitability mode, Guangzhou Commercial Storage and Transport Company, 2012.1 – 2012.8, contract fund RMB150,000.
4. Improvement plan and inventory control effectiveness program, Tokheim Hengshan Technologies (Guangzhou) Co., Ltd, 2012.7 – 2013.7, contract fund RMB300,000.
5. Development strategy and planning of stainless steel industry in Xinxing County, Social and Economic Development Research Office of Xinxing County, 2011.8 – 2012.6, contract fund RMB200,000.
6. Research on Economic development of Pearl River Delta and Baosteel’s industrial opportunities during the process of industrial restructuring, Baosteel Group Corporation, 2012.5 – 2012.11, contract fund RMB200,000.
7. Development Planning of Guangzhou National Integrated Circuit Design Industrialization, Guangzhou Xinghai Integrated Circuit Center Co., Ltd. 2013.1 – 2012.5, contract fund RMB90,000.
8. Research on International Operation of Enterprises: Taking Huawei as an Example, a key project sponsored by National Social Science Project Fund, 2015-2016. 
9. Project of Improving the Effectiveness of Planning and Inventory Control, Tokheim Hengshan Technology Co., Ltd., 2012.7 – 2013.12.


Lecture

Operations Management, Supply Chain Management(MBA)
Operations Management (EMBA)